Most homeowners who call us about a shower remodel have the same concern: "I don't want to deal with hiring a plumber, then a tile guy, then a glass company, then an electrician — and hope they all show up in the right order."
We get it. That's why we built our business to handle the entire shower remodel from start to finish. Whether you're in Phoenix, Scottsdale, Paradise Valley, Fountain Hills, Chandler, Gilbert, Mesa, Tempe, Peoria, Glendale, Cave Creek, or Queen Creek — you make one phone call, and we take care of the rest.
What We Coordinate
A shower remodel isn't just a tile job. It's a multi-trade project, and every piece has to happen in the right sequence. Here's everything we manage for you:
Tile Installation
This is our core trade. From large-format porcelain to natural stone and mosaic accents, we handle all tile work — walls, floors, niches, benches, and curbless entries. Proper waterproofing is included in every project.
Plumbing
New valves, drains, shower heads, handheld sprayers, body jets, rain heads — whatever your new shower calls for. We work with licensed plumbers who handle the rough-in before tile and the trim-out after. If you're converting a tub to a shower, they handle the drain relocation too.
Glass Enclosures
Frameless doors, semi-frameless, sliding enclosures, fixed panels — we coordinate glass measurement after tile is complete and schedule the install once it's fabricated. No guesswork, no gaps, no callbacks.
Electrical
Recessed shower lighting, exhaust fan upgrades, GFCI outlets, and heated floor systems. Our licensed electricians handle the rough-in during demo and the final connections at the end. Everything is up to code.
The point: You don't call four companies. You call us. We bring the right people at the right time, and we're responsible for the final result.
How It Works
We're not a general contractor who subs everything out and disappears. We're tile installers who've built a team of licensed specialists we trust — plumbers, electricians, and glass professionals who work with us regularly and know our standards.
Here's what that looks like for you:
- One point of contact — you talk to us, not four different companies
- One schedule — we coordinate every trade so they show up in the right order
- One timeline — you know when it starts, what happens each week, and when it's done
- One company responsible — if something needs to be fixed, you call us
Why This Matters
When a homeowner tries to coordinate their own shower remodel, here's what usually happens: the plumber finishes but the tile guy can't start until next week. The tile is done but the glass company needs three weeks to fabricate. The electrician was supposed to rough in before tile but nobody told him. Now there's a hole in the wall.
We've seen it all. And the reason we started handling every trade ourselves is because we got tired of showing up to tile a shower where the plumbing wasn't ready, or coming back for a punch list that was actually another contractor's mistake.
When we manage the whole project:
- No chasing contractors who don't call back
- No scheduling conflicts between trades
- No finger-pointing when something goes wrong
- No surprises on your timeline
Typical Project Timeline
Every shower is different, but here's the general sequence for a full-service remodel:
Remove old tile, fixtures, and drywall. Inspect framing and subfloor for damage.
Install new valve, relocate drain if needed, run lines for shower heads and body jets.
Wire for recessed lighting, exhaust fan, heated floors, and GFCI outlets.
Full membrane waterproofing system on walls and floor. This is what protects your home.
Walls, floor, niches, bench, accents. The largest portion of the project.
Template for frameless glass after tile is complete — ensures a perfect fit.
Install shower head, handle, drain cover, light fixtures, and fan.
Frameless door or enclosure installed and sealed.
We walk the project with you, confirm everything is right, and hand it over.
Most full-service shower remodels take 2 to 3 weeks from demo to final walkthrough, depending on tile complexity and glass fabrication lead times.
Cities We Serve
We handle full-service shower remodels across the entire Phoenix metro area. Click your city to see our local shower tile installation page:
Frequently Asked Questions
Do you do the plumbing and electrical yourselves?
No — we work with licensed plumbing and electrical specialists who are part of our in-house team. We coordinate all scheduling and manage their work so you only deal with us. You make one phone call, and we handle the rest.
Are your subcontractors licensed and insured?
Yes. Every plumber and electrician we work with is licensed and insured in the state of Arizona. You can verify any contractor's license at azroc.gov.
How long does a full shower remodel take?
Most full-service shower remodels take 2 to 3 weeks from demo to final walkthrough. This includes plumbing rough-in, waterproofing, tile installation, glass fabrication and install, and electrical work. Timelines vary based on project complexity and glass lead times.
Do I need to coordinate anything myself?
No — that's the whole point. We handle all scheduling and coordination between trades. You have one point of contact, and we manage the timeline from demo to walkthrough.
What cities do you serve?
We serve the entire Phoenix metro area including Phoenix, Scottsdale, Paradise Valley, Fountain Hills, Cave Creek, Chandler, Gilbert, Mesa, Tempe, Peoria, Glendale, and Queen Creek.